Preparatory work

Markup of structures
We carry out the marking of structures, focusing on the axes, in order to increase the accuracy of installation. We carry out according to the technology in accordance with the best construction practices.

Using Leica laser levellers
For precise installation we use Leica laser levellers. We carry out according to the technology in accordance with the best construction practices.

Using Bosch measuring tool
For precise installation we use Bosch measuring tool. We carry out according to the technology in accordance with the best construction practices.

Using the 3D object scanning method
We use the 3D scanning method of objects so that the measurements are as accurate as possible and the design documentation can be adjusted after plastering. We carry out according to the technology in accordance with the best construction practices.

Monitoring of the workflow using video surveillance
To ensure the transparency of work and the safety of property we install video surveillance cameras at the facilities. We carry out according to the technology in accordance with the best construction practices.

Isolating the common areas for protection
During the work, we close the common areas to protect them from possible damage and contamination. We carry out according to the technology in accordance with the best construction practices.

Isolation of riser communications for protection
During the construction period, we isolate the riser communications to prevent their contamination. We carry out according to the technology in accordance with the best construction practices.

Using of filters on the branches of the ventilation system
During the construction period, we install filters on the branches of the ventilation system to prevent dust from entering it. We carry out according to the technology in accordance with the best construction practices.

Using a covering material to protect translucent structures
During the construction period, we protect translucent structures from possible damage and contamination with the help of covering materials. We carry out according to the technology in accordance with the best construction practices.

Wall cladding of technical areas with PVC tiles
To give an aesthetic appearance and maintain hygiene we cover the walls of the technical areas with PVC tiles. We carry out according to the technology in accordance with the best construction practices.
processes of finishing works directly
at our facilities.
Plaster

Using of cement mixtures that prevent the peeling of coatings
We use cement mixtures for plastering damp and unheated rooms to prevent peeling of the coating. We carry out according to technology, according to MDS 12-30.2006 "Methodological recommendations on norms, rules and techniques of finishing works".

Preparation of places for installation of shadow and hidden skirting boards
We prepare places in advance for the installation of shadow and hidden skirting boards during plastering to ensure sound insulation. We carry out according to the technology in accordance with the best construction practices.

Knocking down the influx of concrete to reduce the thickness of the plaster layer
We knock down the concrete build-up before applying the plaster to reduce the thickness of the plaster layer. We carry out according to the technology in accordance with the best construction practices.

Wall sanding to prevent coatings from peeling off
We sand and clean the concrete walls before plastering to prevent peeling of the coating. We carry out according to technologies, according to SP 71.13330.2017 "Insulation and finishing coatings" and MDS 12-30.2006 "Methodological recommendations on norms, rules and techniques of finishing works".

Preparation of the surface for plastering, taking into account the type of substrate and the mixture
We prepare the surfaces for plastering taking into account the type of substrate and the chosen plaster mixture to prevent peeling of the coatings. We carry out according to technologies, according to SP 71.13330.2017 "Insulation and finishing coatings" and MDS 12-30.2006 "Methodological recommendations on norms, rules and techniques of finishing works".

Installing a damping tape for plaster
We install a damping tape for plaster to prevent the formation of cracks on the surfaces as a result of shrinkage of the building. We carry out according to the technology in accordance with the best construction practices.

Filling of seams and holes in partitions with refractory foam
We fill the seams and holes in the partitions with refractory foam to ensure the fire resistance of the structures. We carry out according to technologies in accordance with SP 2.13130 "Fire protection systems. Ensuring the fire resistance of protection facilities".

Treatment of metal elements with an anti-corrosion compound
We treat metal elements with an anti-corrosion compound before plastering to prevent the formation of rust on the surfaces. We carry out according to technologies in accordance with SP 28.13330.2017 "Protection of building structures from corrosion" and MDS 12-30.2006 "Methodological recommendations on norms, rules and techniques of finishing works".

Strengthening the connection of various materials
We strengthen the connection of various materials in preparation for plastering to prevent peeling of the coatings. We carry out according to technologies in accordance with SP 71.13330.2017 "Insulation and finishing coatings" and MDS 12-30.2006 "Methodological recommendations on norms, rules and techniques of finishing works".

Installation of the grid when exceeding the permissible thickness of the plaster layer
We install the grid when the allowable thickness of the plaster layer is exceeded to prevent peeling of the coatings. We carry out according to technologies in accordance with SP 71.13330.2017 "Insulation and finishing coatings".

Laying the plaster mesh with the necessary overlap
The plaster grid must be laid with the necessary overlap to prevent peeling of the coatings. We carry out according to technologies in accordance with SP 71.13330.2017 "Insulation and finishing coatings" and MDS 12-30.2006 "Methodological recommendations on norms, rules and techniques of finishing works".

Fastening of lighthouses during plastering with cement mixtures
To prevent peeling of the coatings, when plastering with cement mixtures, it is necessary to attach lighthouses to the same mixtures. We carry out according to technologies in accordance with SP 71.13330.2017 "Insulation and finishing coatings".

Placing the plaster grid in the center of the plaster layer
It is necessary to place the plaster grid in the center of the plaster layer to avoid peeling of the coatings. We carry out according to technologies in accordance with SP 71.13330.2017 "Insulation and finishing coatings"

The use of spot fastening of plaster lighthouses
We use spot fastening of plaster lighthouses so that cracks do not appear on the surfaces. We carry out according to technologies in accordance with the instructions of "Knauf" and "Saint-Gobain" companies.

Using a mechanized plastering method
We use a mechanized plastering method to speed up the process. We carry out according to technologies in accordance with the instructions of "Knauf" and "Saint-Gobain" companies.

Cleaning of plaster lighthouses at the end of the process
We remove plaster lighthouses to prevent rust from appearing on the surfaces. We carry out according to technologies in accordance with SP 71.13330.2017 "Insulation and finishing coatings".

Incision at the inner corners with a special plane
We make incisions at the inner corners with a special plane so that the shape of the object is perfect. We carry out according to the technology in accordance with the best construction practices.
processes of finishing works directly
at our facilities.
Slopes

Insulation of slopes on translucent structures
We insulate the slopes so that mold does not appear on translucent structures in winter. We carry out according to the technology in accordance with the best construction practices.

Plastering of slopes of translucent structures with cement compounds
We plaster the slopes of translucent structures with cement compounds to prevent the appearance of mold in winter. We carry out according to technologies in accordance with GOST 30971-2012 "Seams of mounting units of window blocks to wall openings".

Vapor barrier of internal seams of slopes of translucent structures
We vapor insulate the inner seams of the slopes of translucent structures so that mold does not appear in winter. We carry out according to technologies in accordance with GOST 30971-2012 "Seams of mounting units of window blocks to wall openings".

Using a thermal imager to check the insulation quality of the structure
We use a thermal imager to check how well the structures are insulated. We carry out according to the technology in accordance with the best construction practices.
processes of finishing works directly
at our facilities.
Soundproofing

The use of soundproof mats
We install sound-proofing mats to ensure that the rooms below are protected from impact noise. According to SP 51.13330.2011 "Noise protection".

Fastening of soundproofing mats to each other
We fasten the soundproofing mats to each other so that they continue to protect the lower rooms from impact noise. We carry out according to technologies in accordance with SP 51.13330.2011 "Noise protection".

Laying the edge of the sound insulation material on the walls above the screed level
We install soundproofing mats so that their edges reach the walls above the screed level. This is necessary to protect the lower rooms from impact noise. We carry out according to technologies in accordance with SP 51.13330.2011 "Noise protection".

Installation of sound insulation mats forming sharp corners
We install soundproofing mats in such a way as to form sharp corners. This is necessary to protect the lower rooms from impact noise. We carry out according to technologies in accordance with SP 51.13330.2011 "Noise protection".

Covering the places of utilities under the screed with a vibroacoustic sealant
We cover the places with vibroacoustic sealant where utilities run under the screed to protect the lower rooms from shock noise. We carry out according to technologies in accordance with SP 51.13330.2011 "Noise protection".

Covering the fasteners of utilities with a vibroacoustic sealant under the screed
We cover the fasteners of utilities with a vibroacoustic sealant under the screed to protect the lower rooms from shock noise. We carry out according to technologies in accordance with SP 51.13330.2011 "Noise protection".
processes of finishing works directly
at our facilities.
Floor screed

Using a mechanized method for laying the screed
We use a mechanized method for laying the screed to speed up the process. We carry out according to the technology in accordance with the best construction practices.

Laying a floating screed, strengthening it with a metal mesh
We lay the floating screed, strengthening it with a metal mesh to prevent peeling and deflection of the floor coverings. We carry out according to technologies in accordance with the manual "Floors. Technical requirements and rules for design, installation, acceptance, operation and repair".

Laying metal mesh in the lower third of the layer when creating a floating screed
We place a metal mesh in the lower third of the layer when creating a floating screed to prevent peeling and deflection of the floor coverings. We carry out according to technologies in accordance with the manual "Floors. Technical requirements and rules for design, installation, acceptance, operation and repair".

Laying metal mesh overlap when creating a floating screed
We lay overlap of the metal mesh to avoid peeling and deflection of the floor coverings when creating a floating screed. We carry out according to technologies in accordance with the manual "Floors. Technical requirements and rules for design, installation, acceptance, operation and repair".

The connection of a metal mesh with a certain pitch when creating a floating screed
We connect the metal mesh with a certain pitch to avoid peeling and deflection of the floor coverings when creating a floating screed. We carry out according to technologies in accordance with the manual "Floors. Technical requirements and rules for design, installation, acceptance, operation and repair".

Incisions in the places of heat-shrinkable seams in a metal mesh
We make incisions in the metal mesh in the places of the shrink seams to avoid peeling and deflection of the floor coverings when creating a floating screed. We carry out according to technologies in accordance with the manual "Floors. Technical requirements and rules for design, installation, acceptance, operation and repair".

Heat shrinkable seams when creating a screed
We make shrink seams when creating the screed to avoid peeling and deflection of the floor coverings. We carry out according to technologies in accordance with SP 29.13330.2011 "Floors".

Moistening the screed surface for a week
We moisten the screed surface for a week to avoid peeling and deflection of the floor coverings. We carry out according to the technology in accordance with the best construction practices.
processes of finishing works directly
at our facilities.
Frame partitions

The use of sealing tape when installing frame partitions
We use sealing tape when installing frame partitions, linings and suspended ceilings to protect against noise. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

Installation of rack profiles when installing frame partitions and linings
We mount the rack profiles at a certain distance from the ceiling when installing frame partitions and linings so that cracks do not appear on the surfaces during shrinkage of the building. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

Fixing the rack profiles on the guides using the method of cutting with a bend
We fix the rack profiles on the rails using the folding cutting method when installing frame partitions and linings so that cracks do not appear on the surfaces during shrinkage of the building. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

In some cases, the use of reinforced profiles
In some cases, we use reinforced profiles when installing frame partitions and linings so that the structures do not collapse and cracks do not appear on the surfaces. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

The holes in the profiles of utility racks should not exceed the permissible size.
When installing frame partitions and linings, we do not make holes in the profiles of utility racks larger than the permissible size so that the structures do not collapse and cracks do not appear on the surfaces. We carry out the technology according to the instructions of the company "Knauf".

Fixing of sheet materials on frame partitions, linings and suspended ceilings with displacement
We fix sheet materials on frame partitions, linings and suspended ceilings with displacement so that the structures do not collapse and cracks do not appear on the surfaces. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

Required gaps at the top and bottom of the material
When cladding frame partitions and linings, we leave the necessary gaps from the top and bottom of the material to protect against noise and prevent cracks from appearing on the surfaces during shrinkage of the building. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

Rounding of the ends of plasterboard sheets in the necessary places when covering frame partitions
In the necessary places when covering frame partitions, linings and suspended ceilings we round off the ends of the plasterboard sheets so that cracks do not appear on the surfaces. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

The use of different types of self-tapping screws depending on the type of sheet material
We use different types of self-tapping screws depending on the type of sheet material when sheathing frame partitions, linings and suspended ceilings so that the structure does not collapse and cracks do not appear on the surfaces. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

The necessary step of fastening and displacement of the fixing points of the sheet material
We observe the necessary step of fastening and shifting the fixing points of the sheet material to ensure that structures do not collapse and cracks do not appear on the surfaces when cladding frame partitions, linings and suspended ceilings. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

Ensuring the necessary recessed self-tapping screws when fastening sheet materials
When installing frame partitions, linings and suspended ceilings, it is important to ensure that the screws are properly recessed when fixing sheet materials to prevent structural collapse and cracks on the surfaces. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

Filling of upper and lower gaps with vibroacoustic sealant
We fill the upper and lower gaps with a vibroacoustic sealant to preserve sound insulation after covering the frame partitions and linings. We carry out the technology according to the instructions of the company "Knauf".

Fixing suspensions on metal anchors
We fix the suspensions on metal anchors to prevent the ceiling from collapsing in case of fire during the installation of suspended ceilings. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

Filling joints and fixing points of plasterboard sheets with specialized putty
We fill the joints and attachment points of plasterboard sheets with specialized putty when installing frame partitions, linings and suspended ceilings to prevent cracks on the surfaces. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

Reinforcement of joints of plasterboard sheets with special tapes
We reinforce the joints of plasterboard sheets with special tapes during the cladding of frame partitions, linings and suspended ceilings to prevent the formation of cracks on the surfaces. We carry out according to technologies, in accordance with SP 163.1325800.2014 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation".

The use of special mounting boxes to ensure effective noise protection
When installing sound insulation linings, we use special mounting boxes to provide effective noise protection. We carry out the technology according to the instructions of the company "Knauf".

Cladding of frame partitions, linings and ceilings with cement slabs
If necessary, we sheathe the frame partitions, cladding and ceilings with cement slabs to prevent peeling of the coatings. We carry out the technology according to the instructions of the company "Knauf".

Strengthening the joints of cement slabs with a special mesh
When cladding frame partitions, linings and suspended ceilings, we strengthen the joints of cement slabs using a special mesh to prevent cracks on the surfaces. We carry out the technology according to the instructions of the company "Knauf".

Creation of slopes of coplanar doors according to special technology
We create the slopes of the coplanar doors according to a special technology during the cladding of the frame partitions to prevent the appearance of cracks on the surfaces. We carry out the technology according to the instructions of the company "Knauf".

Filling cavities of structural profiles with mineral wool
We fill the cavities of the structural profiles with mineral wool when installing the partition frames to ensure sound insulation. We carry out according to the technology in accordance with the best construction practices.
processes of finishing works directly
at our facilities.
Water supply and heating

Installation of pipes using thermal insulation
We install pipes in water supply and heating systems using thermal insulation to prevent leaks due to thermal expansion of pipes and mold formation due to condensation. We carry out according to technologies in accordance with SP 30.13330.2020. "Internal water supply and sewerage of buildings."

Pipe installation with press fittings
We install stainless steel or copper pipes with press fittings in water supply, heating and boiler rooms, which reduces the size of structures. We carry out according to the technology in accordance with the best construction practices.

Installation of water meters with impulsive output
We install water meters with a pulse output in the water supply units, which allows us to automatically transmit readings. We carry out according to technologies in accordance with SP 30.13330.2020. "Internal water supply and sewerage of buildings."

Installing a leak protection system
We install leak protection systems in water supply and heating units to prevent damage to property in the event of leaks. We carry out according to technologies in accordance with SP 29.13330.2011 "Floors".

Installation of self-cleaning water filters
We install self-cleaning water filters in water supply units, which simplifies maintenance and avoids the need for periodic cleaning of filters in faucets and household appliances. We carry out according to the technology in accordance with the best construction practices.

Installation of pressure regulators
If necessary, we install pressure regulators in the water supply units, which prevent leaks of plumbing and household appliances due to excessive pressure. We carry out according to technologies in accordance with SP 30.13330.2020. "Internal water supply and sewerage of buildings."

Installation of fine line filters
We install fine line filters in the water supply units, which allows us to comprehensively improve water quality. We carry out according to the technology in accordance with the best construction practices.

Installation of running water heaters
If possible, we install running water heaters in the water supply units, which reduces the size of the water supply units. We carry out according to the technology in accordance with the best construction practices.

Application of collector wiring
We use collector wiring In the water supply and heating units to prevent water temperature spikes in the mixers and ensure uniform heating of the premises. We carry out according to the technology in accordance with the best construction practices.

Installation of hydraulic shock compensators
We install hydraulic shock compensators in the water supply units to prevent water temperature spikes in the mixers. We carry out according to the technology in accordance with the best construction practices.

Crimping of the water supply and heating system
After installing the water supply and heating systems, we perform high-pressure crimping to prevent possible leaks. We carry out according to technologies in accordance with SP 30.13330.2020. "Internal water supply and sewerage of buildings."

Required slope during installation of sewer pipelines
We adhere to the necessary slope during the installation of sewer pipelines to ensure rapid drainage of water and prevent the formation of blockages. We carry out according to the technology in accordance with the best construction practices.

Installation of sewer pipelines
We use smooth bends to prevent the formation of blockages when installing sewer pipelines. We carry out according to technologies in accordance with SP 30.13330.2020. "Internal water supply and sewerage of buildings."

Installation of sound insulation material on sewer pipe risers
We install sound insulation material on the risers of sewer pipes to prevent noise when draining water from the upper rooms. We carry out according to the technology in accordance with the best construction practices.

Installation of "dry" siphons in the sewage system
We install "dry" siphons in the sewer system to connect household appliances to avoid the penetration of sewer gases into the room. We carry out according to technologies in accordance with SP 30.13330.2020. "Internal water supply and sewerage of buildings."

Installation of "dry" siphons with jet rupture for connection of climatic equipment
We install "dry" siphons with a burst jet in the sewer system to connect the climate control equipment to prevent sewer gases from entering the room. We carry out according to technologies in accordance with SP 30.13330.2020. "Internal water supply and sewerage of buildings."

Installation of convectors
We install convectors with the ability to adjust their position during the laying of floor coverings in order to achieve an ideal fit. We carry out according to the technology in accordance with the best construction practices.
processes of finishing works directly
at our facilities.
Electrical panels

Installing an "S" type safety shut-off device
If necessary, we install "S" type safety shut-off devices in electrical panels, which provide protection against electric shock and fire but prevent false power outages. We carry out according to the technology in accordance with the best construction practices.

Installation of the load priority relay
If the allocated power is insufficient, we install load priority relays in the electrical panels to prevent power outages at the facility when using powerful electrical appliances. We carry out according to the technology in accordance with the best construction practices.

Installation of voltage relays in electrical panels
We install voltage relays in electrical panels to protect equipment from breakdowns due to power surges. We carry out according to the technology in accordance with the best construction practices.

Installation of type "B" circuit breakers
We install type "B" circuit breakers in electrical panels to provide additional fire safety. We carry out according to the technology in accordance with the best construction practices.

Laying a part of the electrical wiring in a screed
If possible, we stack some of the electrical wiring in a screed to reduce cable consumption. We carry out according to the technology in accordance with the best construction practices.

Installation of electrical wiring in corrugated pipes
We install the electrical wiring in the screed in corrugated pipes to protect it from damage during work and during shrinkage of the screed. We carry out according to the technology in accordance with the best construction practices.

The use of copper cable in the installation of electrical wiring
We use copper cable, which does not support combustion and has low smoke generation, when installing electrical wiring to ensure fire safety. We carry out according to technologies in accordance with GOST R 53315-2009 "Cable products. Fire safety requirements".

Using the crimping method
We connect electrical cables by crimping to ensure the durability of the power supply system. We carry out according to technologies in accordance with SP 76.13330.2016 "Electrotechnical devices".

Installation of an additional potential equalization system
We install an additional potential equalization system to protect against electric shock when touching several metal objects in the bathrooms. We carry out according to technologies, in accordance with the rules of electrical installations.

Installing underfloor heating with temperature sensors
When installing electric underfloor heating, we place temperature sensors inside the heating zones at a distance of at least 400 mm from the edges to ensure accurate measurement of floor temperature. We carry out according to technologies in accordance with the instructions of manufacturers of electric underfloor heating.

Installing the thermostat
If necessary, we install thermoregulators for underfloor heating in the electrical panel to improve the aesthetic appearance. We carry out according to the technology in accordance with the best construction practices.

The use of special transformers for lighting
We use special transformers for lighting, which are mounted on a rail in the electrical panel to save space. We carry out according to the technology in accordance with the best construction practices.
processes of finishing works directly
at our facilities.
Ventilation and air conditioning

Installation of ventilation and air conditioning system
We use flat air ducts during the installation of ventilation and air conditioning systems so as not to reduce the design ceiling height. We carry out according to the technology in accordance with the best construction practices.

Sealing of air outlet connections with aluminum tape
We seal the duct connections with aluminum tape during the installation of ventilation and air conditioning systems to ensure proper air quality. We carry out according to technologies, in accordance with SP 60.13330.2016 "Heating, ventilation and air conditioning".

Installation of insulated air ducts
We install insulated ducts during the installation of ventilation and air conditioning systems to prevent mold formation due to condensation and reduce noise levels during system operation. We carry out according to technologies in accordance with SP 51.13330.2011 "Noise protection".

Installation of climate control equipment on vibration-proof fasteners
We install climate control equipment and air ducts on vibration-proof fasteners to prevent noise during system operation. We carry out according to technologies in accordance with SP 51.13330.2011 "Noise protection".

Installation of frameless slit diffusers
We install frameless slit diffusers when installing climate control systems to enhance the appearance. We carry out according to the technology in accordance with the best construction practices.
processes of finishing works directly
at our facilities.
Waterproofing and tiles

Lowering the floor level
We lower the floor level in damp rooms so that water is guaranteed to reach the sensors of the leak protection system. We carry out according to technologies in accordance with SP 29.13330.2011 "Floors".

Installing special tape for corners
We install special tapes for the corners when installing waterproofing to provide protection from water. We carry out according to technologies, in accordance with SP 163.1325800.201 "Constructions using plasterboard and gypsum fiber sheets. Rules of design and installation" and the instructions of manufacturers of waterproofing materials.

Installation of special cuffs during installation of waterproofing
We install special cuffs for the terminals of communications during the installation of waterproofing to provide protection from water. We carry out according to technologies, in accordance with the instructions of manufacturers of plumbing and waterproofing materials.

Selection of porcelain stoneware pattern
If necessary, we select a porcelain stoneware or stone pattern to make the coating more beautiful. We carry out according to the technology in accordance with the best construction practices.

Providing the necessary floor slope in the shower
We provide for the necessary slope of the floor in the shower area so that the water flows towards the trays, channels or ladders. We carry out according to technologies in accordance with SP 29.13330.2011 "Floors".

Using tile adhesive
We use tile adhesives that match the characteristics of porcelain stoneware or stone to prevent peeling of the coatings. We carry out according to the technologies of GOST R 56387 "Dry building adhesive mixtures on cement binder" and the instructions of manufacturers of tile adhesives.

Application of the tile leveling system
We use a tile leveling system to ensure a smooth granite or stone surface. We carry out according to the technology in accordance with the best construction practices.

Sanding of the outer corners of porcelain stoneware
We sand the outer corners of porcelain stoneware at 45 degrees to make the surface looks more attractive. We carry out according to the technology in accordance with the best construction practices.

Filling interplate seams
We fill the interplate seams with epoxy compounds to protect them from humidity and prevent the appearance of mold. We carry out according to the technology in accordance with the best construction practices.

The corners of granite and stone are slightly rounded
We make the outer corners of granite and stone slightly rounded to prevent injury and chipping during operation. We carry out according to the technology in accordance with the best construction practices.

Filling of interplate joints with silicone sealant
We fill the interplate seams in the inner corners and at the joints with silicone sealant to prevent the formation of cracks. We carry out according to the technology in accordance with the best construction practices.

Selection of revision hatches
We select the revision hatches according to the tile location. We carry out according to the technology in accordance with the best construction practices.

Installation of revision hatches
We install revision hatches, which are covered with porcelain stoneware, making it easy to open and preventing the tiles from chipping off. We carry out according to the technology in accordance with the best construction practices.

Application of membrane waterproofing materials
If necessary, we use membrane waterproofing materials to prevent cracking on the porcelain stoneware as a result of stress transfer from the base. We carry out according to technology in accordance with the instructions of Schluter, Prodeso and Knauf.

The use of a special membrane for heating cable of underfloor
If necessary, we use a special membrane for heating cables of underfloor to prevent the formation of cracks on the porcelain stoneware caused by temperature shock. We carry out according to technology in accordance with the instructions of Schluter, Prodeso and Knauf.
processes of finishing works directly
at our facilities.
Floor coverings

Using Lagler grinding machines
We prevent floor coverings from peeling off and speed up work with Lagler grinders. We carry out according to the technology in accordance with the best construction practices.

Application of the engineering board laying method
We apply the method of laying on plywood using glue to prevent peeling of the floor coverings during the installation of parquet and engineering boards. We carry out according to technologies, according to the instructions of manufacturers of wooden floor coverings.

Choosing an engineering board pattern
We choose an engineering or parquet board pattern to create a more attractive appearance. We carry out according to the technology in accordance with the best construction practices.

Precise undercut of floor coverings
We precise undercut the floor coverings to enhance their appearance. We carry out according to the technology in accordance with the best construction practices.

Filling joints with polyurethane sealants
We fill the joints between the floor coverings with polyurethane sealants to make them more aesthetic, wear-resistant and hygienic. We carry out according to the technology in accordance with the best construction practices.

Installing shadow skirting boards
We install shadow skirting boards after basic wall plastering to create an ideal plane and prevent the formation of putty deposits in the area of the skirting boards. We carry out according to the technology in accordance with the best construction practices.

Careful installation of shadow skirting boards to adjacent door frames
We carefully adjust the shadow skirting boards to the adjacent door frames to give the finish an aesthetic appearance. We carry out according to the technology in accordance with the best construction practices.
processes of finishing works directly
at our facilities.
Putty and painting

The use of a mechanized method of applying filler compounds
We use a mechanized method of applying putty compounds to speed up the work. We carry out according to the technology in accordance with the best construction practices.

The use of a mechanized method of grinding compounds
We use a mechanized method of grinding putty compounds to speed up the work. We carry out according to the technology in accordance with the best construction practices.

The use of composite tapes
We use composite tapes on the outer corners in preparation for painting to make the surfaces more aesthetic and easy to repair. We carry out according to the technology in accordance with the best construction practices.

Using fiberglass
We use fiberglass in preparation for painting to make the surfaces less cracked. We carry out according to the technology in accordance with the best construction practices.

Using the airless painting method
We use the airless painting method to make the surfaces more beautiful. We carry out according to the technology in accordance with the best construction practices.

Applying the wall surface for painting up to the "K4" standard
If necessary, we bring the preparation of wall surfaces for painting up to the "K4" standard in order to avoid the appearance of shadows in side lighting. We carry out according to technologies in accordance with SP 71.13330.2017 "Insulation and finishing coatings".

Careful connection of paint and varnish coating layers
We carefully combine the layers of paint coatings to make the surfaces look more attractive. We carry out according to technologies in accordance with SP 71.13330.2017 "Insulation and finishing coatings".
processes of finishing works directly
at our facilities.
Door installation

Installing the door frames together with the canvases
We install the door frames together with the canvases to prevent uneven gaps and problems with opening. We carry out according to the technology in accordance with the best construction practices.

The use of magnetic door limiters with a lock in the door leaf
We use magnetic door limiters with a lock in the door leaf to make them more attractive and prevent injury. We carry out according to the technology in accordance with the best construction practices.

Installation of floor door limiters
We install door limiters closer to the edge of the door leaf so that the hinges are not damaged during use. We carry out according to the technology in accordance with the best construction practices.
processes of finishing works directly
at our facilities.
Aerated concrete blocks

Fastening of partitions from aerated concrete blocks by means of flexible joints
We attach partitions aerated concrete block to existing walls using flexible joints to prevent cracks from appearing on the surfaces due to uneven shrinkage. We carry out according to technologies in accordance with the instructions of the Ytong company.

Using vertical bandaging
We carry out vertical bandaging when installing partitions made of aerated concrete blocks to prevent the collapse of structures. We carry out according to technologies in accordance with the instructions of the Ytong company.

Filling seams with foam
We fill the joints between partitions masonry and existing walls with foam to prevent cracks from appearing on the surfaces due to uneven shrinkage and to ensure sound insulation. We carry out according to technologies in accordance with the instructions of the Ytong company.

Installation of partitions from aerated concrete blocks
We install partitions made of aerated concrete blocks with the necessary clearance from the upper overlap to avoid cracks on the surfaces during shrinkage of the building. We carry out according to technologies in accordance with the instructions of the Ytong company.

Fastening of a partition made of aerated concrete blocks to the upper overlap
If necessary, we attach partitions made of aerated concrete blocks to the upper overlap to avoid collapse of the structure. We carry out according to technologies in accordance with the instructions of the Ytong company.
processes of finishing works directly
at our facilities.